Saint John's Medical Pavilion aka 2020 Santa Monica

2020 Santa Monica

  • Client – Sisters of Charity of Leavenworth, Leavenworth, Kansas/Saint John’s Medical Center, Santa Monica, California.
  • Location – Santa Monica, California.
  • As the Senior Development Manager, Michael Keller of  2M Corporation served as the project lead in acquiring and converting a six-story commercial office building located across the street from Saint John’s Health Center to a medical office building.  
  • The project involved a complex ground lease, challenging entitlements, significant shell and core upgrades and high profile tenant improvements. 
  • The building, which was largely vacant and close to being taken back by the bank as a general commercial office building, is now a thriving medical office  building. Primary executions were for a full floor oncology group (28,000 SF), a full floor orthopedic group (28,000 SF), UCLA Medical Group (40,000 SF), DaVita Dialysis Center (8,000 SF), Saint John’s Health Center (28,000 SF), and a number of smaller physician tenants that are currently enjoying beneficial occupancy.
  • Project construction executed by Turner Construction – Los Angeles, California under the guidance of Michael Keller.
  • Architects – WBSA of Irvine, California.  

Memorial Medical Center Addition & Expansion

  • Client – Memorial Medical Center.
  • Location – Las Cruces, New Mexico. 
  • As the Senior Project Manager, Michael Keller of 2M Corporation served as the project lead in overseeing a 58K SF addition, a 10K SF Surgery Center expansion, as well as complete reconfiguration of the main bed tower and emergency department shared entrances.  
  •  The project involved extensive swing space creation, alternative way-finding solutions, complex structural modifications, new elevator bank addition, reconfiguration of the Labor/Delivery/Recovery suites, as well as physical plant expansions & additions.
  • Project construction executed by Jaynes Corporation –  Albuquerque, New Mexico under the guidance of Michael Keller.
  • Architects – Dekker/Perich/Sabatini of Albuquerque, New Mexico.

Parker Adventist Professional Building

  • Client – Centura Health/Parker Adventist Hospital.
  • Location: Parker, Colorado.
  • Shared entrance with hospital lobby.
  •  Size: 86,000 BGSF.
  •  Ambulatory Care Center        
  •  Ambulatory Surgery 
  • Diagnostic Imaging
  • Physician Offices
  • Leasing Intensive
  • Physician Relocation & Backfill
  • Project construction executed by the local General Contractor, G.E. Johnson of Boulder, Colorado under the guidance of Michael Keller.
  • Architect – HKS Architects of Dallas, Texas. 

Carson-Tahoe Medical Office Building

Carson-Tahoe Medical Office Building

  • Client – Carson Tahoe Regional Medical Center.
  •  Location: Carson City, Nevada.
  • 40,000 GSF Medical Office Building & 60,000 GSF Oncology Center.
  • Tenant Build Outs.
  • 2M Team Members led the project team through the feasibility study, ground lease negotiation, tenant pre-leasing, financing and pre-development phases of this on-campus medical office building project and Oncology Center. Michael Keller also carefully monitored the project during the construction and move-in phases.
  •  Project construction was executed by the local General Contractor, Shaheen Beauchamp of Carson City, Nevada under the guidance of Michael Keller.
  •  Architect – HMC Architects of Reno, Nevada.  

Brentwood Professional Office Building

  • Client – John Muir/Mt. Diablo Health System.
  •  Location: Brentwood, Contra Costa County, California.
  •  110,000 GSF Medical Office Building.
  •  Extensive On-site and Off-site installations as well as Tenant Build Outs.
  • Michael Keller led the project team through the feasibility study, ground lease negotiation, tenant  pre-leasing, financing and pre-development phases of this on-campus medical office building project. Project was a greenfield site development with all infrastructure upgrades embedded into the overall delivery in anticipation of a fully developed acute care medical facility.  Project included 16,000 SF ASC, Mobile MRI pad and helipad fully permitted by the FAA.
  • Project construction was executed by the local General Contractor, Turner Construction of San Francisco, California under the guidance of Michael Keller.
  •  Architect – BFHL Architects of San Francisco, California.