Get Details on Our Previous Building Development Projects
Photo Gallery
Saint John's Medical Pavilion aka 2020 Santa Monica
- Client – Sisters of Charity of Leavenworth, Leavenworth, Kansas/Saint John’s Medical Center, Santa Monica, California.
- Location – Santa Monica, California.
- As the Senior Development Manager, Michael Keller of 2M Corporation served as the project lead in acquiring and converting a six-story commercial office building located across the street from Saint John’s Health Center to a medical office building.
- The project involved a complex ground lease, challenging entitlements, significant shell and core upgrades, and high-profile tenant improvements.
- The building, which was largely vacant and close to being taken back by the bank as a general commercial office building, is now a thriving medical office building. Primary executions were for a full floor oncology group (28,000 SF), a full floor orthopedic group (28,000 SF), UCLA Medical Group (40,000 SF), DaVita Dialysis Center (8,000 SF), Saint John’s Health Center (28,000 SF), and a number of smaller physician tenants that are currently enjoying beneficial occupancy.
- Project construction executed by Turner Construction – Los Angeles, California under the guidance of Michael Keller (2M Corporation).
- Owner/Developer - Hammes Company Healthcare LLC of Brookfield, Wisconsin.
- Architects – WBSA of Irvine, California.
Memorial Medical Center Addition and Expansion
- Client – Memorial Medical Center.
- Location – Las Cruces, New Mexico.
- As the Senior Project Manager during this execution, Michael Keller then of Bradbury Stamm Construction served as the project lead in overseeing a 58K SF addition, a 10K SF Surgery Center expansion, Labor/Delivery/Recovery (LDR) Renovations, Elevator Bank Addition as well as complete Central Plant & Infrastructure Upgrades and Emergency Department/Main Lobby shared entrances renovations.
- The project involved extensive swing space creation, alternative way-finding solutions, 58K SF addition, 10K SF Surgery Center expansion, complex structural modifications, new elevator bank addition, reconfiguration of the Labor/Delivery/Recovery suites, Emergency Department/Main Lobby shared entrances renovations as well as physical plant expansions & additions.
- Construction Manager - Bradbury Stamm Construction of Albuquerque, New Mexico
- General Contractor - Jaynes Corporation of Albuquerque, New Mexico under the guidance of Bradbury Stamm Construction (Michael Keller, Senior PM) [2M Corporation].
- Owner - Memorial Medical Center of Las Cruces, New Mexico.
- Architects – Dekker/Perich/Sabatini of Albuquerque, New Mexico.
Parker Adventist Professional Building
- Client – Centura Health/Parker Adventist Hospital.
- Location: Parker, Colorado.
- Shared entrance with hospital lobby.
- Size: 86,000 BGSF.
- Ambulatory Care Center
- Ambulatory Surgery
- Diagnostic Imaging
- Physician Offices
- Leasing Intensive
- Physician Relocation & Backfill
- Project construction executed by the local General Contractor, G.E. Johnson of Boulder, Colorado under the guidance of Michael Keller (2M Corporation).
- Owner/Developer - Dasco Companies (Lend Lease Dasco) of Palm Beach Gardens, Florida
- Architect – HKS Architects of Dallas, Texas.
Carson-Tahoe Medical Office Building
- Client – Carson Tahoe Regional Medical Center.
- Location: Carson City, Nevada.
- 40,000 GSF Medical Office Building & 60,000 GSF Oncology Center.
- Tenant Build-Outs.
- 2M Team Members led the project team through the feasibility study, ground lease negotiation, tenant pre-leasing, financing, and pre-development phases of this on-campus medical office building project and Oncology Center. Michael Keller also carefully monitored the project during the construction and move-in phases.
- Project construction was executed by the local General Contractor, Shaheen Beauchamp of Carson City, Nevada under the guidance of Michael Keller (2M Corporation).
- Owner/Developer - Hammes Company Healthcare LLC of Brookfield, Wisconsin.
- Architect – HMC Architects of Reno, Nevada.
Brentwood Professional Office Building
- Client – John Muir/Mt. Diablo Health System.
- Location: Brentwood, Contra Costa County, California.
- 110,000 GSF Medical Office Building.
- Extensive On-site and Off-site installations as well as Tenant Build‑Outs.
- Michael Keller led the project team through the feasibility study, ground lease negotiation, tenant pre-leasing, financing, and pre-development phases of this on-campus medical office building project. Project was a greenfield site development with all infrastructure upgrades embedded into the overall delivery in anticipation of a fully developed acute care medical facility. Project included 16,000 SF ASC, Mobile MRI pad, and helipad fully permitted by the FAA.
- Project construction was executed by the local General Contractor, Turner Construction of San Francisco, California under the guidance of Michael Keller. (2M Corporation)
- Owner/Developer - Dasco Companies (Lend Lease Dasco) of Palm Beach Gardens, Florida.
- Architect – BFHL Architects of San Francisco, California.